Home
My  Garden
About  Me
Pool & Spa Designs Pool Design
Design Gallery
Natural  pools
Infinity Pools
Salt  Water Pools
Water Features
Spa Gallery
Spa Design
Portable Hot Tubs
Redwood Hot Tubs
Inflatable Spas
Chemical Free Spas
Saunas
Steambaths
Solar Pool Solar Heat
Solar Power
Grid Tie Solar
Pool Construction Pool Builders
Excavation
Plumbing-steel-elect
Tile-Deck-Plaster
Pool Maintenance New Pool Care
Pool Covers
Pool Cleaners
Pool Safety
Pets & Pool Safety
Fun Around the Pool Family Fun
Garden Parties
Outdoor Kitchens
Outdoor Furniture
Outdoor Fireplaces
Backyard  Weddings
Ramadas
Back Yard Landscape Ideas Water Fountains
Landscaping Tips
Gardening Tips
The Earthbox
The Earthbox Store
Site Information Recommended Links
Design Info Blog
Site Map
Link Request
Contact Us

[?] Subscribe To This Site

XML RSS
Add to Google
Add to My Yahoo!
Add to My MSN
Subscribe with Bloglines

 

2nd Phase of Pool Construction

The 2nd phase of POOL construction includes the plumbing, steel reinforced rods, electric, creating the pool shell with shotcrete, and inspections.

This is a picture of a swimming pool plumbing

Plumbing
The plumbers will install the plumbing with non-corrosive PVC pipe. This will properly filtrate the water in your pool. If you are installing an infloor cleaning system, this is the time that this system is installed. I highly suggest that you put in an infloor cleaning system. These systems really make it easy to keep your pool clean.
This is a picture of a swimming pool steel Steel Reinforced Rods
Reinforced steel rebar will be placed throughout your pool shell. The steel will be of varying sizes. They will be on the bottom of the pool, up the sides around the skimmer and into the bond beam. These steel rods add strength and durability to your pool shell. They will also put in concrete spacers to make sure that the steel isn't against the wall or on the floor of the pool. This will allow the shotcrete to be evenly applied under and over the steel. The amount of steel varies depending on your local soil and climate conditions.



Electric
Your electrician will now run wire from your electric panel to your pool pump. They will also wire for your lighting in the pool. Ground fault interrupter devices will be installed for protection against an electric fault. The final electrical connections are completed just before your final inspection.



This is a picture of a shotcrete swimming pool



Creating the Concrete Shell
The pool shell is pneumatically applied under high pressure. Your pool builder will recommend either a shotcrete or gunite concrete material. The choice is made based on your soil conditions and year round climate. It will have to meet the standards of your local building codes. This concrete material will ensure that you have a reinforced steel and concrete pool of superior strength.

After the shotcrete is applied you have to cure the pool with water. This is usually the home owner's responsibility. You will need to spray the pool with water up to four times a day for at least four days if the weather is warm. Your pool builder will give you advice on how often you need to spray the pool. This will prevent premature curing and will minimize shrinkage cracks in your shotcrete shell.

Note...

If you are planning on having rock work or a water feature added to your pool, this would be done after they finish with the shotcrete.

Inspections

During this phase detailed inspections are done by your pool builders superintendent. Local building inspectors are required to inspect the construction. Your pool builder's superintendent will contact the authorities to schedule pool construction inspections. He will then notify you as to when the inspection will take place. You will have to make sure that the gates are open so the inspectors can get in. After the inspections you can let your pool builder know what the status is and this will keep things moving along a bit faster.


Next Phase: FINISHING THE POOL from Pool Construction